In partnership with Merge Urban Development Group and Slingshot Architecture, ISG led the design of the Brio Building, a mixed-use development project that features commercial and residential space.
To accommodate Iowa’s urban population growth, Metro Waste Authority invested in a new recycling facility, which houses state-of-the-art equipment, capable of sorting and baling 45,000 tons of recyclables each year.
Great Lakes Energy required assistance to collect and analyze existing network structures for National Electrical Safety Code (NESC) compliance and complete remediation design of pole violations.
ISG partnered with TDS Telecommunications on a variety of projects, including DSA node cabinet placements, 1- to 10- mile line extensions, and fiber connections for upgrading nodes.
This two-year, phased project began with a strategic master plan to construct a paper machine facility, control center, and resource center with production, administration, warehouse, and employee resource spaces.
The addition to Procter & Gamble's tissue paper manufacturing facility was prompted by the dual objectives of meeting heightened capacity demands and striving for enhanced operational efficiency.